Sunday, April 20, 2008

demo done, rehab begins


And so begins this house's second lease on life. The basic idea for rehabbing the upstairs was to move a wall back to its rightful place, restore most of the wood trim, repair the walls, & fix the rear porch. The bathroom was a major focus too. It's coming along nicely. Slowly I can see it turning from something that was mostly unappealing to a real gem. It's exciting going over at the end of the day to see the progress that's been made.

Some more in-progress pics here.

Friday, April 18, 2008

nice view, eh?


Continuing on with the demo phase of the project house -- here's a few pics of sunlight hitting the sleeping porch. I'm sure it's been many years. As is representative of my neighborhood, there are a mix of architectural styles ranging from victorian, classical revival, arts & crafts. Even a sprinkling of postwar homes that somehow got tossed into the mix. I love the beadboard detail in this porch. It is going to look awesome when we're done with it.. :)

Thursday, April 17, 2008

heating & cooling done


Well we finally got this little side project done. The old AC unit is no more and we got a new furnace. Unfortunately, I didn't read my estimate closely enough to notice that replacing the ducting in the basement wasn't included. Ouch. Lesson learned.. We'll probably do it eventually, I'm hoping sometime in the fall before it gets cold. The condenser at ground level is huge -- it's a little distracting. Fortunately it's towards the rear of the property. :)

Wednesday, April 9, 2008

heating & cooling upgrade


I've been waiting to upgrade this contraption for some time now. For the uninitiated, this is called an evaporative AC unit (a swamp cooler). You see these used in dry environments with little humidity. It works by running water over a fibrous element and blowing this cooled air into the house. Think of it working like how the body uses sweat to produce a cooling effect on the skin. Ok, regional AC lesson over. Since this home was retrofitted with AC later on in its life, the upstairs would only ever feel any cool air during summertime. The ducting for this unit runs through the attic with ceiling vents carved out in the four rooms upstairs (that's also on the to-do list). Meaning there was no AC on the 1st floor.. When it got hot enough, the old unit didn't work very well so this will be a welcome upgrade. We're finally ripping this thing out for good.

The plan is to upgrade the furnace to a modern unit and replace the old AC with refrigerated air. Since I hate getting on my roof for any maintenance, the condenser is getting placed at ground level. Yay! Here's what the old furnace looked like. It wasn't the original, although it probably dates back to the 60s.


When we first bought this house more than 2 years ago, the ducting was absolute crap. The first floor would get marginally warm and the upstairs was always cold. The basement felt like an inferno. Over the course of each winter I've tried to tighten up the ducting and replace the actual duct tape with the stuff you're actually supposed to use (I forget the name). I insulated some of the worst sections too. This helped out tremendously and lowered our gas bill in the process too. But alas, the novelty of my patch job must come to an end. This is all getting replaced with brand new insulated ducting that should be energy efficient for some time to come. Following are some more pics of the tentacle-like ducts that branch out in all directions in the basement.


Wednesday, April 2, 2008

demo week bedrooms


There wasn't too much to demo in the bedrooms aside from the dropped ceilings, but the differences are noticeable. There's just something about 10 ft ceilings.. :)

Tuesday, March 25, 2008

demo week bath pics


Here are some new pics I loaded into the project house photo set. Demoing this bathroom totally opened it up and revealed some of the original grandeur. I'm really interested if anyone has ever heard about scoring plaster like that. Never seen it, but it's pretty cool.

Monday, March 17, 2008

nursery done

The nursery has finally come full circle. Well almost.. I still need to replace the sash cords and refinish the doors, but for all intents & purposes we're calling this one "done". If you recall from another post, I decided against trying to refinish down to the wood in this room (sorry stuccohouse). In it's place is some white trim against a light yellow-tan color (I forget the name). I think it came out looking really good, so at least one bedroom is presentable.